Free Shipping Over $150 (Excludes Bikes & Bulky items).

TLD Flowline MIPS Helmet (25.2 Model)

Regular Price
$279.00
Sale Price
$279.00
Regular Price
$279.00
Out of Stock - Call for ETA
Unit Price
per

Tax included. Shipping calculated at checkout.

Colour | Grey and Glo Yellow

Size | XS / S

Flowline MIPS Open Face Helmet
DISCIPLINE: Trail

Don’t let its casual looks fool you. Flowline quietly intertwines Troy Lee Designs' dependable helmet protection and comfort features with an affordable price point. Beneath its clean, understated hood, Troy Lee Designs leans on years of helmet technology experience to crank up the performance, earning a Five-Star safety rating from Virginia Tech.

FEATURES

  • •    3-Way adjustable screwless visor
    •    Mips® B-Series Rotational Impact Brain Protection System
    •    Full 360-degree fit retention system with 3-way rear height adjustment 
    •    14 vents for maximum airflow  
    •    Full wrap in-mold construction
    •    Extended Coverage MTB Trail Helmet
    •    Side strap adjusters